AMPP CIP Level 2 exam-day sheet
The rules and numbers for this exam, on one page you can print. Each section links to the page that explains it.
Download the PDF Sheets for the other exams
Film thickness
| Dry from wet | DFT = WFT × VS ÷ 100 |
| Wet from dry | WFT = DFT × 100 ÷ VS |
| Wet from dry, with thinner | WFT = DFT × (100 + thinner %) ÷ VS |
| Theoretical spreading rate | m²/L = 10 × VS % ÷ DFT µm |
| Spreading rate, US units | ft²/US gal = 1604 × VS % ÷ 100 ÷ DFT mils |
| Units | 1 mil = 25.4 µm · °F = °C × 9 ÷ 5 + 32 |
More: volume solids · calculators
Conditions
- Steel at least 3 °C above the dew point during blasting, application and early cure (SSPC-PA 1 gives 5 °F); many specifications also cap relative humidity, often at 85 %.
- Read the steel temperature on the surface you will coat, with a contact thermometer.
Dry film thickness
- SSPC-PA 2, Level 3 (the default): a spot is the average of 3 or more readings in a 4 cm circle; single readings are not restricted. An area is 5 spots in about 10 m². Each spot average at least 80 % of the minimum and at most 120 % of the maximum; each area average within the range.
- ISO 19840: mean ≥ nominal; every reading ≥ 80 % of nominal; fewer than 20 % of readings between 80 % and 100 %; none above the maximum. Subtract 10, 25 or 40 µm for a fine, medium or coarse profile (25 µm if unknown).
- Gauges: magnetic and eddy-current gauges read over metal; ultrasonic gauges read over concrete and can separate layers. The Tooke gauge (ASTM D4138) reads each coat in a precise angled cut, so it is destructive.
Adhesion
- Pull-off (ISO 4624, ASTM D4541): report the stress and the failure mode: adhesive, cohesive or glue. A glue failure means the coating is at least as strong as the reading.
- Cross-cut (ISO 2409): 0 (nothing detached) to 5, for films up to about 250 µm. ASTM D3359 runs the other way: 5B is best. Thicker films: X-cut (ISO 16276-2) or pull-off.
More: adhesion testing · ISO 16276
Cure
- Solvent-borne (ethyl silicate) inorganic zinc cures with moisture from the air; dry air slows it. Check it with the MEK double-rub test (ASTM D4752) before topcoating. Water-borne (alkali silicate) types cure as the water evaporates; high humidity slows them.
- Organic coatings: solvent rub, hardness and the data sheet's checks. Wash off amine blush before overcoating.
More: cure and recoat · ASTM D4752
Galvanizing and cathodic protection
- Hot-dip galvanizing (ISO 1461, ASTM A123): thickness by magnetic gauge over reference areas; the minimum local and mean values depend on the steel thickness. Before painting (ASTM D6386): clean, then sweep blast or treat the zinc.
- Cathodic protection: a common criterion is −850 mV or more negative against a copper/copper sulfate electrode (NACE SP0169, ISO 15589-1). Too much protection, or an unsuitable coating, can cause cathodic disbondment.
- Holiday testing (NACE SP0188): low-voltage wet sponge for films of 500 µm (20 mils) or less, high-voltage DC for thicker films, at the voltage the film thickness calls for. Too high a voltage damages sound film. Mark, repair and re-test every holiday.
More: ISO 1461 · cathodic protection
Corrosivity
ISO 12944-2: C1 (very low) to C5 (very high) and CX (extreme) in the atmosphere; Im1 fresh water, Im2 sea or brackish water without cathodic protection, Im3 soil, Im4 sea or brackish water with cathodic protection.
More: corrosivity categories
Concrete
- Profile: ICRI CSP 1 to 10, compared or measured with replica putty (ASTM D7682).
- Moisture: plastic sheet (ASTM D4263), calcium chloride emission (ASTM F1869) or in-situ RH probes (ASTM F2170).
Practical exam
Eight instrument stations, up to 8 minutes each, scored out of 100. The eddy-current DFT gauge carries 20 points, the Paint Inspection Gauge and pull-off 15 each.
More: the eight stations
Stop and ask
- Steel less than 3 °C above the dew point, or humidity above the specification's limit.
- Salts, dust or oil above the limits: soluble salts (ISO 8502-6 and -9), dust (ISO 8502-3), compressed air (blotter test, ASTM D4285).
- Mixed paint past its pot life, or a recoat window passed without the preparation the data sheet asks for.
- A hold point not yet released: stop until it is released. Work past an unreleased hold point, or work that does not meet the specification: record a nonconformance.
More: hold points · reports and NCRs
Try it in an exam-style question. The free readiness check shows the question style, explains every answer and gives you a dated study plan.