Coating defect
Outgassing
Bubbles, craters and pinholes that appear minutes to hours after coating concrete or a porous zinc primer.
Causes
- Air and vapour in the pores of concrete expand when its temperature rises.
- Air trapped in a porous inorganic zinc primer or thermal spray coating escapes into the wet top coat.
Prevention
- On concrete, prime or seal first and coat while the concrete temperature is steady or falling.
- Over zinc primer or thermal spray, apply a thinned mist coat before the full coat.
How it is assessed
Visual; holiday testing finds pinholes that are hard to see.
Telling it apart
- Pinholes: Pinholes from the spray technique are spread evenly. Pinholes from outgassing gather over porous areas and appear after application, as the substrate warms.
- Bugholes (surface voids in concrete): Bugholes are the voids in the concrete; outgassing is air from such voids rising into the coating.
Repair
Abrade and fill or reseal the area. A new coat straight over pinholes lets the trapped air through again. The specification and the coating manufacturer have the final word on the repair procedure.
2 practice items in the members area mention outgassing (CIP 2: 2).
Related
Try it in an exam-style question. The free readiness check shows the question style, explains every answer and gives you a dated study plan.
Take the free readiness checkSee the tracksAbout this page
Written from coating practice and the published rating standards, in our own words; the drawing is schematic. Checked on 2026-10-14; errors go in the corrections log. CoatMentor is an independent study aid. It is not affiliated with ISO, AMPP, SSPC, NACE International, ASTM or FROSIO.